OFFSHORE WIND POWER

Offshore WindOffshore wind power is a potential source of electricity generation primarily due to better quality wind resources along with the absence of land constraints. However as of today the costs of installation and operation are almost twice as more than onshore wind power. These costs are set to decline with technological improvement including increased hub heights, turbine capacity, CUFs and floating turbines. MNRE has come out with a draft offshore wind policy in 2013. The policy suggests setting up of 2 GW of capacity in the southern coast to begin with. While a detailed resource potential for the country is yet to be done, some studies suggest that it could be in the range of 350 - 500 GW which indicates that the resource availability is not a constraint for wind power development.

Level 1

India Energy

Level 1 assumes that offshore wind takes off very slowly due to higher cost and other barriers especially with regard to regulatory and associated clearances etc. Installations of identified capacity of 2 GW along the southern coast are delayed and completed after 2030. Capacity by 2047 is 4 GW and electricity generated is 13 TWh.

Level 2

India Energy

Level 2 assumes that the MNRE policy target of 2 GW is achieved by 2025. Without any further improvement in technology and offshore wind potential assessment the sector witnesses a gradual growth in capacity addition reaching 19.5 GW by 2047. The corresponding electricity generation in 2047 would be 64.3 TWh.

Level 3

India Energy

Level 3 assumes that with the improvement in potential offshore site identification and cost reductions India would gradually built up its offshore wind capacity to 2 GW in 2022 meeting MNRE offshore wind policy targets, 35 GW by 2040 and 62 GW by 2047. This results in roughly 205 TWh of generation in 2047. Significant investments would be needed in the transmission and evacuation systems.

Level 4

India Energy

Level 4 assumes that offshore wind power does not face any economic or physical constraints and hence sees a rapid growth in capacity addition. Under the level 4 assumptions, India would follow an aggressive strategy towards construction and operation of offshore wind farms leading to generation of 141 GW by 2047. The resulting generation would be roughly 468 TWh.

Higher costs, transmission infrastructure and reliable integration of variable generation would be key factors that may limit the uptake of offshore wind power in the future.